Vestavia Hills City School District

Vestavia Hills, Alabama

Effective Design and Planning to Find the Right Path Forward

Vestavia Hills City Schools (VHCS) began a process of surveys, town hall meetings and facility assessments about nine months prior to engaging HPM to provide a planning and preconstruction analysis. During the nine months of information gathering, the school district’s administration also engaged a local architect who had worked with them for many years designing and performing various improvements, additions and renovations to individual facilities. As a result of this process, VHCS and the architect began to formulate a plan of renovations and additions that would provide facility solutions to many of the needs identified in the town hall meetings and surveys, and VHCS considered moving forward with a large bond program. HPM was introduced into the equation at this point to help right-size the bond and determine the phasing plan.

Taking a Step Back to Look Forward

In order to review the proposed facility improvements and to evaluate the cost and phasing of each proposed project, HPM performed facility tours and investigations that uncovered many additional issues not yet anticipated in the original proposed plan. HPM also took a step back to study demographic data and enrollment statistics for the system. HPM prepared an enrollment projection study by facility within the system and uncovered some of the proposed projects in the plan would potentially improve situations but would only provide temporary solutions (5 years) to projected growth patterns. By combining the growth projections, facility assessments, phasing plans and cost analysis, HPM provided VHCS with six separate studies with variations that included concepts for property acquisition/disposition, grade realignments and alternative facility improvements to address long-term capacity issues.

Bottom-Line Value

Master planning
Conceptual estimating
Bond right-sizing
Facilities assessments
Phasing plans




Project Details

7,000+ students
8 schools

Owner

Vestavia Hills City Schools
Reference:
Sheila Phillips
Superintendent
phillipssm@vestavia.k12.al.us

Architect

Lathan Associates Architects, P.C.

HPM Services

Project Management