• Product image
  • Product image

Robert G. Pitts Airport

Auburn, Alabama

Providing Guidance to Various Stakeholders Through Multiple Phases

Operating as an extension of the local Airport Director, and working directly with the architect and resident engineer, HPM provided Construction Management Services for Auburn’s new 25,000 square-foot terminal building. Located across the runway from an existing terminal, the project required extensive site development including 45-acres of earthwork and grading, utility and storm water infrastructure extensions, and a new access road, taxiways and apron.

The program was executed in multiple phases to reflect FAA funding cycles. Prior to construction, HPM worked with the architect and resident engineer to developed budgets, reconciling the design with approved funding, prioritize the work in phases, prepare grant applications, solicit bids and structure bid packages to align with FAA funding. After award, HPM assisted with contract administration, coordinating schedules, maintaining job cost accounting and facilitating the flow of information between the architect, consultants, contractors, engineers and the owner.




Project Details

25,000 square-foot terminal
2-story structure steel frame
Barrel rolled metal roof
High impact glass
Sun screening for high degree of visibility

Owner

Auburn University

Architect

Butner Architectural Group

HPM Services

Construction Management